Three tasks under a key result are never equally important. Here is what weighting does to the figure, and how to tell when yours are wrong.

A key result with three tasks under it is almost never three equal thirds. One of them is the thing that actually moves the outcome and two are supporting work, and a tool that averages them flat will tell you a key result is 67% done when the part that mattered has not started.

Weighting fixes that, and it is the number in this system a human is supposed to decide rather than have inferred for them. Here is what it does, and how to tell when yours are wrong.

What weighting does to the figure

Take a key result about dependable push delivery, with three tasks under it. The rule Lakshaya uses is simple: each task's share of the key result is its weight over the total of all the weights, multiplied by how done it is. (That is how a key result that rolls up from its tasks works, which is the default. A key result can instead be moved by check-ins, and then its tasks stay visible but do not decide the number.)

TaskWeightShareDone
Provider failover for APNs4040%100%
Retry queue with backoff3535%60%
Delivery receipt reconciliation2525%0%

Worked through:

  1. Failover contributes 40% of 100, which is 40 points.
  2. The retry queue contributes 35% of 60, which is 21 points.
  3. Receipt reconciliation contributes nothing yet.
  4. The weighted key result reads 61%. Count every task the same and it reads 53%.

The gap between those two figures is what weighting is worth. It goes the other way too: if receipt reconciliation were the work that really mattered and carried most of the weight, the weighted figure would sit well below the flat one, which is the honest answer when the important part has not started.

Weights do not add up to 100

A weight is a share, not a percentage. The rule divides by whatever the weights total, so 3 / 2 / 1 and 50 / 33 / 17 produce identical numbers and you can think in relative importance and stop.

This matters more than it sounds, because it removes the arithmetic that makes people avoid weighting altogether. Adding a fourth task to a key result does not require rebalancing the other three: give it a weight relative to them and the shares resolve themselves.

The one edge worth knowing. Set every weight to zero and there is nothing to divide by. Lakshaya holds the key result at 0% rather than producing an error or, worse, a plausible-looking number.

Work in progress, and the elapsed rule

A task that is neither done nor untouched has to count as something, and the two obvious answers are both bad. Counting it as zero means a key result sits flat for six weeks and then jumps; counting it as done means the figure lies in the other direction.

Lakshaya counts an in-progress task by how far through its own window it is, from its start date to its due date. A task that runs the whole quarter and started three weeks ago contributes roughly a quarter of its weight. The key result therefore moves between check-ins, which is the behaviour you want from something you are going to look at weekly. (Where a connected source reports a real figure for the task, that figure is used instead, and a task with no dates yet counts as halfway.)

The honest limitation: elapsed time is a proxy for progress and a rough one. It is right on average and wrong on any individual task that is stuck. A blocked task keeps accruing by the calendar like any other in-progress task, so a blocked status is a flag for a person to act on, not something the figure corrects for. A cancelled task is different: it drops out of the average entirely, because abandoned work is out of scope rather than 0% done.

Four signs your weights are wrong

  • One task carries more than 60%. It is not a task, it is the key result. Promote it and give the rest their own.
  • Every weight is 1. Sometimes true, usually a sign nobody made the call. Equal weights should be a decision, not a default nobody revisited.
  • The figure feels wrong to the owner. This is the useful signal, and the one people talk themselves out of. If the person closest to the work thinks 61% overstates it, the weights encode somebody else's view of what matters.
  • Weights changed mid-cycle to make a number look better. Legitimate when scope genuinely changed, corrosive otherwise, and visible either way: the task edit and the move it caused in the key result are both in the activity log.

The same rule, one level up

An objective's percentage is the weighted average of its key results, and of each child objective's already-rolled-up figure, weighted by that child's own weight. The rule recurses, so a tree of any depth resolves to one number without anyone re-typing it at each level.

Two consequences worth holding onto. A child objective counts as one weighted item alongside its parent's own key results, not as an average of averages, so a child with eleven key results does not quietly outvote a sibling with two unless you weight it to. And a misconfigured parent cannot hang the page: an objective that appears twice in one walk counts as zero the second time rather than recursing forever.

If you want to see where this sits in the product, the product tours walk through a key result rolling up from its tasks. The same weighting idea also decides how credit splits between people.

Key takeaways

  • Weights are relative shares, not percentages. The rule divides by their total, so 3/2/1 is the same as 50/33/17.
  • An in-progress task counts by how far through its window it is, which is why key results move between check-ins instead of jumping.
  • If one task carries more than about 60% of a key result, it should be a key result of its own.